Phone +41 31 997 98 99
Disturbances +41 840 990 990
info@emch.com
Fellerstrasse 23
Postfach 302
3027 Bern
| Project: | Museum Art.Plus, Donaueschingen |
| Architecture: | Gäbele & Raufer Architekten, Donaueschingen |
| Lift type: | hydraulic passenger elevator |
During the renovation of the former Biedermann Museum into today’s Art.Plus Museum, a modern passenger elevator was integrated. The installation serves four levels and provides barrier-free access throughout the entire building.
The planning was carried out by Gäbele & Raufer Architekten GmbH. The firm completely refurbished the classical historic building and complemented it with a striking extension made of dark exposed concrete – deliberately contrasting with the historic façade. Today, the museum combines contemporary art with an architecture that has evolved over generations.
Quelle: Werner Huber, Publireportage.Berner Kulturagenda
Quelle: Werner Huber (2025, 10. Juli). Zweimal das Gleiche ganz anders [Publireportage]. Berner...
Du steigst in den Aufzug. Eine, zwei, vielleicht fünf weitere Personen sind schon drin. Ohne es...
Einbau eines versenkbaren Treppenlifts in denkmalgeschützter Umgebung – diskrete Innovation für...
Platzangst im Lift kenne ich nicht. Ich finde es auch nicht peinlich, mit anderen zu fahren. Im...
Das 16. Arrondissement zwischen dem Arc de Triomphe, dem Eiffelturm und dem Bois de Boulogne ist...
«Schön», beginnt Martha. «Wir haben die Geschichte schon lange nicht mehr erzählt. Dabei mögen wir...
Der Aufzug wurde 1974 von EMCH Aufzüge erbaut, montiert und nach den damals gültigen Normen in...
Ein bereits bewilligtes Bauprojekt für eine temporäre Erweiterung des Produktionsstandorts von EMCH...
Contact
Bern | Zurich +41 31 997 98 99
Fault clearance service +41 840 990 990
info@emch.com
Fellerstrasse 23 | Postfach 302 | 3027 Bern
Maintenance
Operations Center
Maintenance solutions
Repairs
We are looking forward to you contacting us!